Human lake seepage prevention construction case
Time:2023-12-06 15:28:53 Author:创始人
人工湖底防渗工程


Driven by socio-economic development, people have put forward higher requirements for the living environment, and urban landscape design and quality have received much attention. Artificial lakes are an important part of the landscape, and during the construction process of artificial lakes, it is necessary to do a good job in anti-seepage engineering.

HDPE anti-seepage film is tailored to the characteristics of artificial lakes, with good mechanical properties, resistance to cracking and leakage caused by foundation settlement, high anti-seepage coefficient, easy construction, easy construction quality inspection, and low engineering cost. HDPE film has good puncture resistance and is suitable for landscape flower planting.

To ensure the quality of the artificial lake anti-seepage and water storage project, the construction unit has established a strict quality assurance system, standardized quality management, rigorously reviewed the design drawings of anti-seepage engineering technical measures, fully inspected construction materials, and ensured that the construction conditions of the construction site meet the construction conditions of the project.

Before construction, conduct technical briefing to clarify construction standards, construction techniques, and requirements. During the construction process, strengthen management measures and control the quality of anti-seepage construction, especially anti-seepage membrane construction; After the construction of the artificial lake anti-seepage project, strengthen quality monitoring, conduct on-site inspections, and promptly handle any problems found to ensure the quality of the anti-seepage project.

Construction conditions:

Before carrying out the anti-seepage construction of the project, the construction conditions of the anti-seepage membrane need to be fully considered. If the wind speed exceeds level 4 or in rainy weather conditions, construction should be stopped. When the wind speed is low, it is necessary to use anti-seepage membranes stabilized by heavy objects; The construction temperature of anti-seepage membrane is generally required to be between 5-40 ℃, as the anti-seepage membrane material is prone to thermal expansion and contraction.

Therefore, in hot weather, the construction of the anti-seepage membrane should be kept appropriately relaxed, and in cold weather, the construction of the anti-seepage membrane should be kept appropriately tightened. In addition, it is also necessary to ensure that the construction base surface paving site meets the construction conditions, mainly manifested in flatness, compaction, longitudinal and transverse slopes, vertical depth, etc.